How long will installation of my Solar Energy System take

Gold Coast Solar Electricians Plus
The actual installation process should only take 1 day. Once your system is installed your meter will need to be changed before you can be paid for your exported solar power (feed in Tariff). Energex normally takes few weeks between the installation of the system and the changing of the meter. The changing of the meter itself takes approximately 1 hour.